Pilot Production of Ground Station of Myanmar-based Monywa Copper Mine Succeeded
Monywa Copper Mine in Myanmar recently completed civil work and equipment installation of the ground station. After monomer debugging and no-load trial run in the earlier stage, the equipments are in good state and meet hot commissioning requirements. From October 26 to November 4, the ground station organized eight hot trial runs, proving stable operation of major process equipments, normal functioning of the working systems and stable parameter control of production processes. The quality parameters of emulsion matrixes produced, such as exterior look, viscosity, storage period and density, kept stable. The test shows these matrixes satisfy the requirements for mine production and the ground station is ready for official volume production.